CrossTalk III Questionnaire

Fields marked with an * are required

Total loops across all the panels on the project.
Total additional loops across to be added to an existing CrossTalk III project.
The number of panels is used to calculate the tome required for the import site data and conversion. 1 day of conversion time is used for every 30 panels.
The total number of locations where the Web Client is required for dedicated alarm receiving.
Device isolation manager option for CrossTalk III - This is the number of groups required for automatic isolation.
This is for the number of App Licenses.
This includes for the software to send text messages and an ethernet modem (no SIM).
Fire system networks not already on LT2's in remote locations from server or PC.
A direct fire system network not already on LT2, local to the server or PC, which includes an ethernet switch and cables.
Fire system networks already on LT2's in remote locations from server or PC or local to the PC or server.
Remote IO module in a wall mounting battery backup enclosure, complete with battery for conventional fire panels, plant and panic alarm monitoring.
Starts off with software license for the Niagara element to 4 1/2 years in total, otherwise it is 1 1/2 years.
This is time to create raised 2D floor plans, which typically will handle the content of 4 x CrossTalk 2 floor plan sections.
This is time to create raised 3D floor plans, which typically will handle the content of 4 x CrossTalk 2 floor plan sections.
This is used to calculate the time for testing and checking on site.
The is the time to re-plot and check devices at 1 minute per detector (for new graphics only because direct upgrade auto-plots detectors).
The number of unique action messages that need to be programmed, which are not already part of a CrossTalk upgrade.
New Dell server hardware with RAID disk array, Windows server essentials 2019, HD keyboard and mouse and 3 year warranty.
Number of client's own servers that require setup of the CrossTalk server software only but no hardware.
New Dell PC Web Client hardware with RAID disk array, Windows server essentials 2019, HD keyboard and mouse and 3 year on site warranty.
Number of clients's own client PC's that require setup of the CrossTalk server software only but no hardware.
Synology 2-bay NAS with 2 x 3TB NAS disks, setup in RAID1, with back up agents configured on the server and clients on site.
Is this an upgrade for an existing site where VgeaNET, CrossTalk I or II is installed?
This will include time for setting up dual paths of alarms and then remove those at a later date, requiring 3 days of time.
This means CrossTalk is to be installed on top of an existing Niagara installation. This will still put a 'base' fee on to the price.
The number of Niagara based JACE connections to other controllers on the site or connected systems.
If the site is remote to the office, this will include accommodation and expenses.
If the site is remote to the office, this will include accommodation and expenses. This is by days on site.
The number of days for on site training. Accommodation and travel will be incorporated automatically.
This includes time for the developers to implement a new driver type not currently tested in the field, with some remote support.
The time taken to travel to and from the site in the nearest 1/2 day. This will cover the cost of the engineer in transit.
Include in here any costs for flights and associate travel. Accommodation is already calculated where site visits are required.
  • Tyrrell Products Office

    Beswick House
    Greenfold Way
    Leigh
    Lancashire 
    WN7 3XJ

    Tyrrell Products Contact

    Phone: +44 (0) 1942 732819
    Email: sales@tyrrellproducts.com